Storm Shelter
Installation Process
|
Excavate to a depth of fifty
two inches (52”) with a length of one
hundred eleven inches (111”) and a width of
eighty seven inches (87”). This allows for a
six inch (6”) base of gravel and a three
inch (3”) exposure of the base above ground.
In poorly draining soil, excavate an
additional drainage pit (see illustration)
and fill with free-draining rock. Compact
soil after setting base.
We also recommend installing
drain tile around the base of the storm
shelter and running it to daylight to ensure
proper drainage.
Place butyl seal around base lip (see
inset). Set lid on base being careful not to
dislodge the butyl seal.
Bolt shelter with straps provided. Slope
soil away from shelter. |

Click
to enlarge image. |
| |
|
SI Precast will deliver and set your
storm shelter and can provide a list of excavating
contractors in your area.